Loading/unloading time for 13,5 meters: 90 seconds
The automatic trailer skate system has been developed to load/unload pallets automatically from warehouse dock into the trailer and vice versa.
The main objective is to reduce handling costs where up to 85% of cost reduction can be obtained in case of shuttle operations.
The system is made up of 4 off 13,5 meters powered skates running from dock in sunken tracks of the trailer loading all pallets in 90 seconds.
A higher plate pneumatically raises the skates both in dock and trailer.
Accumulation of pallet loads or connection to automatic silo on warehouse dock by slipchain system.
A fail-safe dock lock and levelling device will be installed for suitable trailer dock connection.
Characteristics:
Trailer/Truck : Trailer will be equipped with 4 sunken tracks with additional fillers to enable conventional forklift operations.
Dock : Dock will be equipped with 4 powered skates with integrated riser plate which pneumatically raises the skates in both dock and trailer.
A slipchain system will accumulate the pallets.