The most efficient way to receive RDF/Biomass/Coal in cement plants or lime plants or plants with incinerators is by means of semi-trailers equipped with moving floors.
These moving floor trailers can be connected directly to our silos/bunkers, also equipped with moving floors and within 15 minutes these moving floor trailers can unload up to 90m3 of RDF/Biomass/Coal into our silos/bunkers.
An efficient unloading between moving floors and our silos/Bunkers will be realised by synchronizing the speeds of both moving floors in the trailers as well as in our silos/bunkers.